{"id":2339,"date":"2012-09-24T16:21:37","date_gmt":"2012-09-24T23:21:37","guid":{"rendered":"http:\/\/a4nr.org\/?p=2339"},"modified":"2012-09-25T11:44:47","modified_gmt":"2012-09-25T18:44:47","slug":"pge-proposed-license-amendment-request-for-seismic-design-basis-at-diablo-canyon","status":"publish","type":"post","link":"https:\/\/a4nr.org\/?p=2339","title":{"rendered":"PG&#038;E Proposed License Amendment Request for Seismic Design Basis at Diablo Canyon"},"content":{"rendered":"<h2><span style=\"color: #000080;\">The following documents relate to PG&amp;E&#8217;s License Amendment Request for the seismic design basis at Diablo Canyon, in chronological order:<\/span><\/h2>\n<p>&nbsp;<\/p>\n<h3><span style=\"color: #000000;\">The 1967 NRC Advisory Committee on Reactor Safeguards (ACRS) pre-construction licensing discussion which established the original seismic design basis for Diablo Canyon, based on four postulated earthquake scenarios:<\/span><\/h3>\n<h3><span style=\"color: #ff0000;\"><a href=\"http:\/\/a4nr.org\/wp-content\/uploads\/2012\/09\/092067-AEC-ACRS-1.pdf\"><span style=\"color: #ff0000;\">0<span style=\"color: #ff0000;\">92067 AEC ACRS-1<\/span><\/span><\/a><\/span><\/h3>\n<p>&nbsp;<\/p>\n<h3>PG&amp;E&#8217;s Application to the NRC for the License Amendment Request to modify the licensing seismic design basis for Diablo Canyon:<\/h3>\n<h3><a href=\"http:\/\/a4nr.org\/wp-content\/uploads\/2012\/09\/102011-PGE-NRC-LAR-DB-mod-app.pdf\"><span style=\"color: #ff0000;\">102011 PGE-NRC LAR DB mod app<\/span><\/a><\/h3>\n<p>&nbsp;<\/p>\n<h3><span style=\"color: #000000;\">SUMMARY OF JANUARY 26,2011, PRE-LICENSING MEETING WITH\u00a0PACIFIC GAS AND ELECTRIC COMPANY ON RESPONSES TO THE\u00a0U.S. NUCLEAR REGULATORY COMMISSION STAFF&#8217;S QUESTIONS FROM\u00a0THE PREVIOUS PUBLIC MEETING ON DECEMBER 9, 2010:<\/span><\/h3>\n<h3><span style=\"color: #ff0000;\"><a href=\"http:\/\/a4nr.org\/wp-content\/uploads\/2012\/09\/022311-NRC-PGE-DBE-mt.pdf\"><span style=\"color: #ff0000;\">022311 NRC-PGE DBE mt*<\/span><\/a><\/span><\/h3>\n<p>&nbsp;<\/p>\n<h3>Meeting outline and agenda for March 31, 2011 meeting between NRC and PG&amp;E to discuss design basis License Amendment Request:<\/h3>\n<h3><span style=\"color: #ff0000;\"><a href=\"http:\/\/a4nr.org\/wp-content\/uploads\/2012\/09\/033111-NRC-PGE-mt-on-LTSP-vs-DB.pdf\"><span style=\"color: #ff0000;\">033111 NRC-PGE mt on LTSP vs DB<\/span><\/a><\/span><\/h3>\n<p>&nbsp;<\/p>\n<h3><span style=\"color: #000000;\">Summary of March 31, 2011 meeting between NRC and PG&amp;E regarding PG&amp;E&#8217;s responses to NRC on issues raised in January 2011:<\/span><\/h3>\n<h3><span style=\"color: #ff0000;\"><a href=\"http:\/\/a4nr.org\/wp-content\/uploads\/2012\/09\/051311-Summary-of-NRC-mt-033111.pdf\"><span style=\"color: #ff0000;\">051311 Summary of NRC mt 033111<\/span><\/a><\/span><\/h3>\n<p>&nbsp;<\/p>\n<h3>Transcript of March 31, 2011 meeting between NRC and PG&amp;E regarding License Amendment Request:<\/h3>\n<h3><span style=\"color: #ff0000;\"><a href=\"http:\/\/a4nr.org\/wp-content\/uploads\/2012\/09\/PGE_transcript-\u2026ing-meeting.pdf\"><span style=\"color: #ff0000;\">PGE_transcript \u2026ing meeting<\/span><\/a><\/span><\/h3>\n<p>&nbsp;<\/p>\n<h3>NRC Meeting notes for June 20, 2011 meeting with PG&amp;E\u00a0regarding License Amendment Request<\/h3>\n<h3><span style=\"color: #ff0000;\"><a href=\"http:\/\/a4nr.org\/wp-content\/uploads\/2012\/09\/062011-NRC-DB-LAR-mt-notes.pdf\"><span style=\"color: #ff0000;\">062011 NRC-DB-LAR mt notes<\/span><\/a><\/span><\/h3>\n<h3><\/h3>\n<p>&nbsp;<\/p>\n<h3><\/h3>\n<h3>NRC staff letter to PG&amp;E questioning missing data fromPG&amp;E Shoreline Fault Report as relates to original seismic design basis criteria for Diablo Canyon:<\/h3>\n<h3><span style=\"color: #ff0000;\"><a href=\"http:\/\/a4nr.org\/wp-content\/uploads\/2012\/09\/080111-NRC-staff-on-PGE-DB-LRA.pdf\"><span style=\"color: #ff0000;\">080111 NRC staff on PGE DB LRA<\/span><\/a><\/span><\/h3>\n<p>&nbsp;<\/p>\n<h3>Letter from Alliance for Nuclear Responsibility to NRC Chairman Allison Macfarlane re: PG&amp;E failure to answer all questions asked of them in NRC letter of August 1, 2011:<\/h3>\n<h3><span style=\"color: #ff0000;\"><a href=\"http:\/\/a4nr.org\/wp-content\/uploads\/2012\/09\/072612-Macfarlane01.pdf\"><span style=\"color: #ff0000;\">072612 Macfarlane01<\/span><\/a><\/span><\/h3>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The following documents relate to PG&amp;E&#8217;s License Amendment Request for the seismic design basis at Diablo Canyon, in chronological order: &nbsp; The 1967 NRC Advisory Committee on Reactor Safeguards (ACRS) pre-construction licensing discussion which established the original seismic design basis for Diablo Canyon, based on four postulated earthquake scenarios: 092067 AEC ACRS-1 &nbsp; PG&amp;E&#8217;s Application [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[11,28,22],"tags":[],"class_list":["post-2339","post","type-post","status-publish","format-standard","hentry","category-diablo-canyon","category-nrc","category-seismic-issues"],"_links":{"self":[{"href":"https:\/\/a4nr.org\/index.php?rest_route=\/wp\/v2\/posts\/2339","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/a4nr.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/a4nr.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/a4nr.org\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/a4nr.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2339"}],"version-history":[{"count":6,"href":"https:\/\/a4nr.org\/index.php?rest_route=\/wp\/v2\/posts\/2339\/revisions"}],"predecessor-version":[{"id":2354,"href":"https:\/\/a4nr.org\/index.php?rest_route=\/wp\/v2\/posts\/2339\/revisions\/2354"}],"wp:attachment":[{"href":"https:\/\/a4nr.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2339"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/a4nr.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2339"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/a4nr.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2339"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}