AB 42 Veto Language

RE: AB 42 To the Members of the California State Assembly: I am returning Assembly Bill 42 without my signature. This bill would require Pacific Gas & Electric Company (PG&E) to conduct seismic fault studies on the Diablo Canyon Nuclear Power Plant and the California Energy Commission, in consultation with the Department of Conservations California […]

AB 42 Amended – March 17, 2009

AB 42 Amended 031709 http://a4nr.org/wp-content/uploads/2010/05/AB-42-Amended-031709.pdf

ASSEMBLY BILL NO 1632 – February 22, 2005

2010-01_07 State LR precedent documents http://a4nr.org/wp-content/uploads/2010/05/2010-01_07-State-LR-precedent-documents.pdf

An Assessment of California’s Nuclear Power Plants: AB 1632 Report – November 2008

2008-CEC AB 1632 Report-Seismic http://a4nr.org/wp-content/uploads/2010/05/2008-CEC-AB-1632-Report-Seismic.pdf

PG&E-CPUC reply to protests – March 22, 2010

2010-03_22 PGE-CPUC reply to protests http://a4nr.org/wp-content/uploads/2010/05/2010-03_22-PGE-CPUC-reply-to-protests.pdf

PROTEST OF THE ALLIANCE FOR NUCLEAR RESPONSIBILITY, SIERRA CLUB, CALPIRG, ENVIRONMENT CALIFORNIA RESEARCH AND POLICY CENTER TO PACIFIC GAS AND ELECTRIC COMPANY’S APPLICATION TO RECOVER THE COSTS ASSOCIATED WITH RENEWAL OF THE DIABLO CANYON POWER PLANT OPERATING LICENSES – March 10, 2010

2010-03_10 A4NR to CPUC LR protest http://a4nr.org/wp-content/uploads/2010/05/2010-03_10-A4NR-to-CPUC-LR-protest.pdf Pursuant to Rule 2.6 of the Commission Rules of Practice and Procedure, the Alliance for Nuclear Responsibility, Sierra Club, CALPIRG, Environment California Research Center, (A4NR et al) hereby submits this protest to the application of Pacific Gas and Electric Company (PG&E) to recover the costs associated with renewal […]

A4NR to CPUC Seismic protest – February 18, 2010

2010-02_19 A4NR to CPUC Seismic protest http://a4nr.org/wp-content/uploads/2010/05/2010-02_19-A4NR-to-CPUC-Seismic-protest.pdf Pursuant to Rule 44.1 of the Commission Rules of Practice and Procedure, the Alliance for Nuclear Responsibility, Sierra Club, Environment California Research and Policy Center, and CALPIRG (ANR, et al) hereby submit this Protest to the APPLICATION OF PACIFIC GAS AND ELECTRIC COMPANY (U 39 E)

PG&E’s Reply to Protests and Responses – February 4, 2010

2010-02_03 PGE reply to protests in GRC http://a4nr.org/wp-content/uploads/2010/05/2010-02_03-PGE-reply-to-protests-in-GRC.pdf

PG&E’s Response to Letter from President Peevey – January 29, 2010

2010-01_29 PGE Darbee to CPUC Peevey re LR http://a4nr.org/wp-content/uploads/2010/05/2010-01_29-PGE-Darbee-to-CPUC-Peevey-re-LR.pdf

PGE to CPUC seismic study filing – January 15, 2010

2010-01_15 PGE to CPUC seismic study filing http://a4nr.org/wp-content/uploads/2010/05/2010-01_15-PGE-to-CPUC-seismic-study-filing.pdf

« Previous PageNext Page »