2006 CPUC testimony of PG&E on costs

Testimony of PG&E’s James Becker in 2006 as to proposed cost of relicensing, anticipated to be from $4-6 million. 20 CPUC-Becker transcript

PG&E – Sun Desert Court Decision 1983

PGE-Sun Desert Court Decision 1983 http://a4nr.org/wp-content/uploads/2010/05/PGE-Sun-Desert-Court-Decision-1983.pdf

Assembly Bill No. 1632 – September 29, 2006

AB 1632 http://a4nr.org/wp-content/uploads/2010/05/AB-1632.pdf

AB 42 Veto Language

RE: AB 42 To the Members of the California State Assembly: I am returning Assembly Bill 42 without my signature. This bill would require Pacific Gas & Electric Company (PG&E) to conduct seismic fault studies on the Diablo Canyon Nuclear Power Plant and the California Energy Commission, in consultation with the Department of Conservations California […]

ASSEMBLY BILL NO 1632 – February 22, 2005

2010-01_07 State LR precedent documents http://a4nr.org/wp-content/uploads/2010/05/2010-01_07-State-LR-precedent-documents.pdf

An Assessment of California’s Nuclear Power Plants: AB 1632 Report – November 2008

2008-CEC AB 1632 Report-Seismic http://a4nr.org/wp-content/uploads/2010/05/2008-CEC-AB-1632-Report-Seismic.pdf

« Previous Page