CPUC Case A.24-03-018 Diablo Canyon Extension

Opening Brief of A4NR in A.24-03-018 A.24-03-018 A4NR Opening Brief PUBLIC VERSION   Testimony of Alliance for Nuclear Responsibility in A.24-03-018 072924 A4NR Testimony PUBLIC VERSION   Protest of A4NR in CPUC A.24-03-018 A.24-03-018 A4NR’s Protest   Amended DWR-PG&E Loan Agreement re: SB 846 070623 Amended DWR-PGE Loan Agreement

R 23-01-007 CPUC proceeding Implementing SB 846 and Potential Extension of Diablo Canyon

TESTIMONY of Alliance for Nuclear Responsibility (redacted): 063023 A4NR Testimony Redacted   EXHIBITS A-L of Alliance for Nuclear Responsibility (redacted): 063023 A4NR Exhibits A-J Redacted   EXHIBITS K-Z3 of Alliance for Nuclear Responsibility (redacted): 063023 A4NR exhibits K-Z redacted   Backup Documentation citing state and federal statute regarding PG&E’s grant and loan disclosures: 070523 Support […]

LAPSES IN MAINTENANCE….OUTDATED EQUIPMENT… RUNNING OUT OF SPARE PARTS!

These are just a few of the problems challenging any thought of extending the life of the Diablo Canyon Nuclear Power Plant. Watch them described by the Diablo Canyon Independent Safety Committee: MORE TECHNICAL HURDLES DETAILED HERE:

SB 968

March 29, 2016… SB 968 passes Senate Energy, Utilities and Communications committee…See the testimony by John Geesman on behalf of the Alliance for Nuclear Responsibility (5 minutes):       SEE THE ENTIRE 35 MINUTE HEARING:     Read about it in the Santa Barbara INDEPENDENT:   http://www.independent.com/news/2016/mar/31/study-planned-impact-early-diablo-canyon-shutdown/       Senator William Monning (D-Santa […]

California State Water Resources Control Board hearing on Once Through Cooling at Diablo Canyon Nuclear Power Plant

On November 18, 2014, the California State Water Resource Control Board heard reports from its Subcommittee regarding the use of once through cooling at Diablo Canyon Nuclear Power Plant, as well as comments from the public.  On behalf of PG&E, contractor Bechtel made a presentation on the options for building cooling towers at the facility. […]

A4NR Ex Parte Notice in PG&E General Rate Case Application 12-11-009

The Alliance for Nuclear Responsibility held ex-parte meetings with advisors to four of the five CPUC commissioners in the matter of PG&E’s general rate case, specifically with regard to wording in the Proposed Decision that appears to undermine the State’s legally valid authority with regard to matters of economics and ratemaking precedent.  You can read […]

PG&E Vice President statement on Once-Through-Cooling possibilities

HERE IS A NUCLEAR ENERGY INDUSTRY INSIDER ARTICLE QUOTING JOHN CONWAY, SENIOR VP OF ENERGY AT PG&E, ON THEIR INTENTION TO CONTINUE TO OPERATE DIABLO CANYON AFTER NEW RULES RESTRICTING THE USE OF ONCE THROUGH COOLING GO INTO EFFECT–OR CHANGING THE FEDERAL LAW BEHIND THE PROHIBITION? 101713 INPO+Conway NOTED

Transcript of California Energy Commission Nuclear Workshop, July 26, 2011

Here is the transcript of the July 26, 2011 California Energy Commission IEPR workshop on nuclear power, held in Sacramento: 072611 CEC IEPR Transcript

ADMINISTRATIVE LAW JUDGE’S RULING SETTING HEARING ON THE PROPOSED SETTLEMENT AND OTHER ISSUES

ADMINISTRATIVE LAW JUDGE’S RULING SETTING HEARING ON THE PROPOSED SETTLEMENT AND OTHER ISSUES 012811 PD 130162

Letter from California Coastal Commission to NRC

Letter from California Coastal Commission to NRC regarding PG&E compliance with federal equivalency review, March 12, 2010 12 CCC-NRC LR not complete

Next Page »