A4NR Testimony to Blue Ribbon Commission on Radioactive Waste 9-13-2011

http://a4nr.org/wp-content/uploads/2011/09/A4NR-Testimony-to-BRC-9.13.11.pdf As the Blue Ribbon Commission comes to the end of its second full year of investigation into the issues surrounding disposal and final disposition of high-level radioactive waste, the Alliance for Nuclear Responsibility again encourages the panel to actively consider holding one of their next meetings in the state of California. While we support […]

1976 NRC memo on USGS seismic reviews

010576 NRC seismic USGS review

Coastal Commission reviews Japanese Tsuanmi and California nuclear plants

The California Coastal Commission has issued a preliminary report on the Japanese tsunami and potential implications for California’s coastal nuclear plants. Of particular interest are the possible effects of a tsunami on the radioactive waste casks stored at the decommissioned Humboldt Bay nuclear facility. 032411 Coastal Commission Tsunami report

Transcript of Mr. Keenan, PG&E, in the 2006 GRC

Transcript of Mr. Keenan, as cross-examined at the CPUC during the GRC on June 26, 2006 062006 CPUC Keenan Transcript cross

Assembly Bill No. 42 – passed 8.31.2009

Assembly Bill No. 42 passed 8.31.09  or http://a4nr.org/?attachment_id=1027 “This bill would require Pacific Gas and Electric Company, in furtherance of the recommendations made by the Energy Commission, to conduct seismic fault studies or surveys in areas at or near the Diablo Canyon Nuclear Power Plant in order to maintain reliable operation of the electrical grid […]

7.6.2010 – Ltr to A4NR from NRC re: response to ltr of 2/2/10 – denial of request

A4NR requested that the NRC staff halt its review of the Diablo Canyon Power Plant, Units 1 and 2 (DCPP) license renewal application until State-requested seismic studies thave been completed. Ltr from NRC to A4NR or http://a4nr.org/?attachment_id=1013

2010 Earthquake Headlines around the world

USGS Shoreline Fault graph

2010-01_10 USGS Shoreline Fault graph

DCPP Seismic Hazard Update (2007 –2013) – Shoreline Fault Evaluation

Lloyd Cluff & Norm Abrahamson PG&E Geosciences 2009 progress briefing January 5, 2010 For the full Power Point Presentation as PDF file: 2010-01_05 Shoreline frault brief PGE to NRC

NRC – SUMMARY OF JANUARY 5, 2010, MEETING WITH PACIFIC GAS AND ELECTRIC COMPANY REGARDING SHORELINE FAULT

On January 5, 2010, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of the Pacific Gas and Electric Company (PG&E, the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. PG&E provided a status of the efforts to estimate and constrain the […]