D.O.E. Consent-based siting for radioactive waste

The Department of Energy is holding a one day workshop on Consent-based siting for nuclear waste on April 26, 2016 at 5pm.  The event will be held at the Holiday Inn, 300 J Street, Sacramento, CA 95814.  Public comments are encouraged, see flier below for details. 4 26 16 Agenda CBS Public Meeting-Sacramento

Summary of NRC “Public” Meeting with PG&E regarding submission of Diablo seismic studies

Summary of NRC “Public” Meeting with PG&E regarding submission of Diablo seismic studies and this is a further test of what is going on with this multi line editing just a tifs wsdfs sdks ssfsdfsdfsdf sdks sf sfserse sf sf sdfsf:     052715 NRC summary-PGE SSHAC mt

NRC responses to Shoreline Fault Analysis

The following documents from the NRC comprise their public output regarding seismic re-evaluation of the Shoreline Fault: FULL REPORT OF THE NRC on seismic re-evaluation of Shoreline Fault: 090112 NRC confirms Shoreline analysis   Cover letter from NRC associated with updated Shoreline analysis: 101212 NRC-PGE Ltr confirms Shoreline   Press release of NRC associated with […]

NRC Population near reactors, from 2000 U.S. Census figures

HERE ARE THE POPULATIONS LIVING WITHIN 20 and 50 MILES OF NUCLEAR REACTORS, FROM THE 2000 U.S. Census NRC population near reactors 2000  

Transcripts of NRC Seismic Workshop in San Luis Obispo, September 9-8, 2010

Transcript of September 8, 2010, morning session 090810 NRC seismic SLO-AM Transcript of September 8, 2010, afternoon session 090810 NRC seismic SLO-PM Transcript of September 9, 2010, morning session 090910 NRC seismic SLO-AM Transcript of September 9, 2010, afternoon session 090910 NRC seismic SLO-PM  

US ENVIRONMENTAL PROTECTION AGENCY REVISIONS TO THE PROTECTIVE ACTION GUIDANCE MANUAL 6.9.2011

http://a4nr.org/wp-content/uploads/2011/06/6-9-11-NRC-vs-EPA-on-protective-action.pdf “PURPOSE: The purpose of this paper is to inform the Commission of the status of the ongoing revisions to the U.S. Environmental Protection Agency (EPA) Protective Action Guidance (PAG) Manual.”

MOTION TO SUSPEND PROCEEDINGS PENDING COMPLETION OF SEISMIC STUDIES 6.17.2011

http://a4nr.org/wp-content/uploads/2011/06/061711-A4NR-CPUC-Motion-to-Suspend-Proceedings-Pending-Completion-of-Seismic-Studies.pdf

NOTICE OF 52-MONTH DELAY AND ORDER REQUIRING STATUS REPORTS

http://a4nr.org/wp-content/uploads/2011/06/NOTICE-OF-52-MONTH-DELAY-AND-ORDER-REQUIRING-STATUS-REPORTS.pdf

PGE Testimony in CPUC case 02/18/11

PGE testimony filed in advance of the CPUC judge’s hearing on whether the settlement should be adopted and whether AB 1632 seismic studies must be completed first 021811 PGE & DRA CPUC testimony

Transcript of James Becker, CPUC + PG&E GRC 2006

Transcript of James Becker, PG&E, in the GRC, as cross-examined on June 26, 2006 at the CPUC. 062006 CPUC-Jim Becker LR costs cross

Next Page »