Assembly Bill No. 1632 – September 29, 2006

AB 1632 http://a4nr.org/wp-content/uploads/2010/05/AB-1632.pdf

AB 42 Veto Language

RE: AB 42 To the Members of the California State Assembly: I am returning Assembly Bill 42 without my signature. This bill would require Pacific Gas & Electric Company (PG&E) to conduct seismic fault studies on the Diablo Canyon Nuclear Power Plant and the California Energy Commission, in consultation with the Department of Conservations California […]

ASSEMBLY BILL NO 1632 – February 22, 2005

2010-01_07 State LR precedent documents http://a4nr.org/wp-content/uploads/2010/05/2010-01_07-State-LR-precedent-documents.pdf

An Assessment of California’s Nuclear Power Plants: AB 1632 Report – November 2008

2008-CEC AB 1632 Report-Seismic http://a4nr.org/wp-content/uploads/2010/05/2008-CEC-AB-1632-Report-Seismic.pdf

CPUC to NRC re 1632 study needs – 4/5/2010

CPUC to NRC re 1632 study needs – 4/5/2010

CEC Boyd to CPUC Peevey re: seismic study

CEC Boyd to CPUC Peevey re seismic study

From County of San Luis Obispo Supervisors to Gregory B. Jaczko, NRC Chairman 3/9/2010

From San Luis Obispo County Supervisors to Gregory B. Jaczko, NRC Chairman 3/9/2010

Statement of U.S. Representative Lois Capps – Statement at NRC Scoping Meeting on the Diablo Canyon Nuclear Power Plant Relicensing Application – 3/3/2010

Statement of U.S. Representative Lois Capps – Statement at NRC Scoping Meeting on the Diablo Canyon Nuclear Power Plant Relicensing Application – 3/3/2010

From City of Morro Bay to Gregory B. Jaczko, NRC Chairman 2/23/2010

From City of Morro Bay to Gregory B. Jaczko, NRC Chairman 2/23/2010

From Sierra Club California to Gregory B. Jaczko, NRC Chairman 2/2/2010

Sierra Club California to Gregory Jaczko, NRC Chairman re Seismic Issues

« Previous PageNext Page »