PROTEST OF THE ALLIANCE FOR NUCLEAR RESPONSIBILITY, SIERRA CLUB, CALPIRG, ENVIRONMENT CALIFORNIA RESEARCH AND POLICY CENTER TO PACIFIC GAS AND ELECTRIC COMPANY’S APPLICATION TO RECOVER THE COSTS ASSOCIATED WITH RENEWAL OF THE DIABLO CANYON POWER PLANT OPERATING LICENSES – March 10, 2010

2010-03_10 A4NR to CPUC LR protest http://a4nr.org/wp-content/uploads/2010/05/2010-03_10-A4NR-to-CPUC-LR-protest.pdf Pursuant to Rule 2.6 of the Commission Rules of Practice and Procedure, the Alliance for Nuclear Responsibility, Sierra Club, CALPIRG, Environment California Research Center, (A4NR et al) hereby submits this protest to the application of Pacific Gas and Electric Company (PG&E) to recover the costs associated with renewal […]

A4NR to CPUC Seismic protest – February 18, 2010

2010-02_19 A4NR to CPUC Seismic protest http://a4nr.org/wp-content/uploads/2010/05/2010-02_19-A4NR-to-CPUC-Seismic-protest.pdf Pursuant to Rule 44.1 of the Commission Rules of Practice and Procedure, the Alliance for Nuclear Responsibility, Sierra Club, Environment California Research and Policy Center, and CALPIRG (ANR, et al) hereby submit this Protest to the APPLICATION OF PACIFIC GAS AND ELECTRIC COMPANY (U 39 E)

PG&E’s Reply to Protests and Responses – February 4, 2010

2010-02_03 PGE reply to protests in GRC http://a4nr.org/wp-content/uploads/2010/05/2010-02_03-PGE-reply-to-protests-in-GRC.pdf

PG&E’s Response to Letter from President Peevey – January 29, 2010

2010-01_29 PGE Darbee to CPUC Peevey re LR http://a4nr.org/wp-content/uploads/2010/05/2010-01_29-PGE-Darbee-to-CPUC-Peevey-re-LR.pdf

PGE to CPUC seismic study filing – January 15, 2010

2010-01_15 PGE to CPUC seismic study filing http://a4nr.org/wp-content/uploads/2010/05/2010-01_15-PGE-to-CPUC-seismic-study-filing.pdf

Blakeslee to CPUC seismic funding – January 8, 2010

2010-01_08 Blakeslee to CPUC seismic funding http://a4nr.org/wp-content/uploads/2010/05/2010-01_08-Blakeslee-to-CPUC-seismic-funding.pdf

CPUC Peevey to PGE Darbee re studies – June 25, 2009

2009-06_25 CPUC Peevey to PGE Darbee re studies http://a4nr.org/wp-content/uploads/2010/05/2009-06_25-CPUC-Peevey-to-PGE-Darbee-re-studies.pdf

OPINION AUTHORIZING PACIFIC GAS AND ELECTRIC COMPANY’S GENERAL RATE CASE REVENUE REQUIREMENT FOR 2007 – 2010 – March 15, 2007

2007-03_15 CPUC GRC decision on License Rewewal http://a4nr.org/wp-content/uploads/2010/05/2007-03_15-CPUC-GRC-decision-on-License-Rewewal.pdf Diablo Canyon operates pursuant to two licenses issued by the NRC that expire in 2024 (Unit 1) and 2025 (Unit 2). PG&E’s request for Nuclear O&M expenses included $16.8 million spread over 2007-2009 for a license renewal feasibility study. The purpose of the study is to analyze […]

A4NR protest CPUC feasibilty study – September 20, 2006

2006-09_15 A4NR protest CPUC feasibilty study http://a4nr.org/wp-content/uploads/2010/05/2006-09_15-A4NR-protest-CPUC-feasibilty-study.pdf Pursuant to Rule 44.1 of the Commission Rules of Practice and Procedure, the Alliance for Nuclear Responsibility and Sierra Club (ANR/SC) hereby submits this protest to the application of Pacific Gas and Electric Company (PG&E). ANR/SC Protest focuses on solely on nuclear operation expenses in the settlement which […]

CPUC-Becker transcript – June 20, 2006

2006-06_20 CPUC-Becker transcript http://a4nr.org/wp-content/uploads/2010/05/2006-06_20-CPUC-Becker-transcript.pdf

« Previous PageNext Page »