Alliance files comments on SLO County DEIR for Diablo Decommissioning

The Alliance for Nuclear Responsibility filed the following comments on the San Luis Obispo County Draft Environmental Impact Report for the Diablo Canyon Decommissioning, August 28, 2023 082923 A4NR comments to SLO DEIR for R2301007  

R 23-01-007 CPUC proceeding Implementing SB 846 and Potential Extension of Diablo Canyon

TESTIMONY of Alliance for Nuclear Responsibility (redacted): 063023 A4NR Testimony Redacted   EXHIBITS A-L of Alliance for Nuclear Responsibility (redacted): 063023 A4NR Exhibits A-J Redacted   EXHIBITS K-Z3 of Alliance for Nuclear Responsibility (redacted): 063023 A4NR exhibits K-Z redacted   Backup Documentation citing state and federal statute regarding PG&E’s grant and loan disclosures: 070523 Support […]

2018 Southern California Edison NDCTP for SONGS

The Protest of the Alliance for Nuclear Responsibility in the 2018 Southern California Edison (SCE) NDCTP, CPUC Application A.18.03.009 042018 A4NR Protest A1803009   The Testimony of John Geesman in the NDCTP for SONGS: 120619 Prepared Testimony of John Geesman A1803009

D.O.E. Consent-based siting for radioactive waste

The Department of Energy is holding a one day workshop on Consent-based siting for nuclear waste on April 26, 2016 at 5pm.  The event will be held at the Holiday Inn, 300 J Street, Sacramento, CA 95814.  Public comments are encouraged, see flier below for details. 4 26 16 Agenda CBS Public Meeting-Sacramento

Summary of NRC “Public” Meeting with PG&E regarding submission of Diablo seismic studies

Summary of NRC “Public” Meeting with PG&E regarding submission of Diablo seismic studies and this is a further test of what is going on with this multi line editing just a tifs wsdfs sdks ssfsdfsdfsdf sdks sf sfserse sf sf sdfsf:     052715 NRC summary-PGE SSHAC mt

NRC responses to Shoreline Fault Analysis

The following documents from the NRC comprise their public output regarding seismic re-evaluation of the Shoreline Fault: FULL REPORT OF THE NRC on seismic re-evaluation of Shoreline Fault: 090112 NRC confirms Shoreline analysis   Cover letter from NRC associated with updated Shoreline analysis: 101212 NRC-PGE Ltr confirms Shoreline   Press release of NRC associated with […]

NRC Population near reactors, from 2000 U.S. Census figures

HERE ARE THE POPULATIONS LIVING WITHIN 20 and 50 MILES OF NUCLEAR REACTORS, FROM THE 2000 U.S. Census NRC population near reactors 2000  

Transcripts of NRC Seismic Workshop in San Luis Obispo, September 9-8, 2010

Transcript of September 8, 2010, morning session 090810 NRC seismic SLO-AM Transcript of September 8, 2010, afternoon session 090810 NRC seismic SLO-PM Transcript of September 9, 2010, morning session 090910 NRC seismic SLO-AM Transcript of September 9, 2010, afternoon session 090910 NRC seismic SLO-PM  

US ENVIRONMENTAL PROTECTION AGENCY REVISIONS TO THE PROTECTIVE ACTION GUIDANCE MANUAL 6.9.2011

http://a4nr.org/wp-content/uploads/2011/06/6-9-11-NRC-vs-EPA-on-protective-action.pdf “PURPOSE: The purpose of this paper is to inform the Commission of the status of the ongoing revisions to the U.S. Environmental Protection Agency (EPA) Protective Action Guidance (PAG) Manual.”

MOTION TO SUSPEND PROCEEDINGS PENDING COMPLETION OF SEISMIC STUDIES 6.17.2011

http://a4nr.org/wp-content/uploads/2011/06/061711-A4NR-CPUC-Motion-to-Suspend-Proceedings-Pending-Completion-of-Seismic-Studies.pdf

Next Page »