NRC Updated Shoreline Fault Report, October 2012

Cover Letter, NRC updated Shoreline Fault Report, October 10, 2012 101212 NRC-PGE Ltr confirms Shoreline Full report: Confirmatory Analysis of Seismic Hazard at the Diablo Canyon Power Plant from the Shoreline Fault Zone,” 090112 NRC confirms Shoreline analysis

A4NR addresses Diablo Canyon Independent Safety Committee on Seismic Concerns

Alliance for Nuclear Responsibility attorney John Geesman questions the Diablo Canyon Independent Safety Committee on PG&E’s choice of a “Level 3” Senior Seismic Hazard Analysis Committee review rather than the more thorough “Level 4” review.  October 10, 2012, in San Luis Obispo:     A4NR Outreach Coordinator David Weisman questions the Diablo Canyon Independent Safety […]

Letter from Michael Peevey CPUC to Coastal Commission (CCC)

October 12, 2012: Letter from Michael Peevey, president, CPUC, to Mary Shallenberger, California Coastal Commission, regarding permits for Diablo Canyon seismic studies 101212 Peevey CPUC-CCC studies  

Critique of Research Vessel Marcus Langseth

Two documents commenting on the performance of the R/V Marcus Langseth, selected by PG&E and SCE as the research vessel for offshore 3D seismic surveys. Cascadia Open-Access Seismic Transects, cruise report, July 2012 Langseth Cascadia report July 1012   From the NEW TIMES, San Luis Obispo, CA October 11, 2012: Floating the Marcus Langseth Who […]

PG&E Proposed License Amendment Request for Seismic Design Basis at Diablo Canyon

The following documents relate to PG&E’s License Amendment Request for the seismic design basis at Diablo Canyon, in chronological order:   The 1967 NRC Advisory Committee on Reactor Safeguards (ACRS) pre-construction licensing discussion which established the original seismic design basis for Diablo Canyon, based on four postulated earthquake scenarios: 092067 AEC ACRS-1   PG&E’s Application […]

Alliance Statement on PG&E Seismic Testing

Download press release here: 092012 A4NR on Seismic Testing PR

VIDEO OF PG&E’s JEARL STRICKLAND at STATE LANDS COMMISSION HEARING

Jearl Strickland of PG&E speaks at State Lands Commission hearing on August 14, 2012 and affirms that the deadline for the utility to respond to the NRC’s 50.54f letter is a hard deadline. (1 min.)  

VIDEO CLIPS OF DR. DRISCOLL AT STATE LANDS COMMISSION HEARING

Commments of Dr. Driscoll and Dr. Bruce Gibson at State’s Land Commission meeting August 14, 2012, Sacramento regarding capabilities of the research vessel Langseth compared to professional petroleum industry vessels. (5 min)   Comments of Dr. Driscoll regarding the 2012-2013 schedule for Research Vessel Langseth and  use of 2D versus 3D study schedule as pertains […]

VIDEO CLIPS OF PG&E DR. NISHENKO AT STATE LANDS COMMISSION HEARING

Dr. Nishenko of PG&E speaks at the State Lands Commission hearing on August 14, 2012 and affirms that PG&E’s seismic study will address the concerns of Dr. Hamilton expressed in the Testimony of the Alliance for Nuclear Responsibility. (2 min.)     Exchange between Mr. Garland of the State Lands Commission and Dr. Nishenko of […]

VIDEO CLIPS OF JOHN GEESMAN and ROCHELLE BECKER FROM STATE LANDS COMMISSION HEARINGS ON DIABLO CANYON SEISMIC STUDIES AUGUST 14, 2012

John Geesman, Attorney, Alliance for Nuclear Responsibility (6 minutes)   Rochelle Becker, executive Director, Alliance for Nuclear Responsibility (3 minutes)

« Previous PageNext Page »