PG&E Proposed License Amendment Request for Seismic Design Basis at Diablo Canyon
The following documents relate to PG&E’s License Amendment Request for the seismic design basis at Diablo Canyon, in chronological order:
The 1967 NRC Advisory Committee on Reactor Safeguards (ACRS) pre-construction licensing discussion which established the original seismic design basis for Diablo Canyon, based on four postulated earthquake scenarios:
092067 AEC ACRS-1
PG&E’s Application to the NRC for the License Amendment Request to modify the licensing seismic design basis for Diablo Canyon:
102011 PGE-NRC LAR DB mod app
SUMMARY OF JANUARY 26,2011, PRE-LICENSING MEETING WITH PACIFIC GAS AND ELECTRIC COMPANY ON RESPONSES TO THE U.S. NUCLEAR REGULATORY COMMISSION STAFF’S QUESTIONS FROM THE PREVIOUS PUBLIC MEETING ON DECEMBER 9, 2010:
022311 NRC-PGE DBE mt*
Meeting outline and agenda for March 31, 2011 meeting between NRC and PG&E to discuss design basis License Amendment Request:
033111 NRC-PGE mt on LTSP vs DB
Summary of March 31, 2011 meeting between NRC and PG&E regarding PG&E’s responses to NRC on issues raised in January 2011:
051311 Summary of NRC mt 033111
Transcript of March 31, 2011 meeting between NRC and PG&E regarding License Amendment Request:
PGE_transcript …ing meeting
NRC Meeting notes for June 20, 2011 meeting with PG&E regarding License Amendment Request
062011 NRC-DB-LAR mt notes
NRC staff letter to PG&E questioning missing data fromPG&E Shoreline Fault Report as relates to original seismic design basis criteria for Diablo Canyon:
080111 NRC staff on PGE DB LRA
Letter from Alliance for Nuclear Responsibility to NRC Chairman Allison Macfarlane re: PG&E failure to answer all questions asked of them in NRC letter of August 1, 2011:
072612 Macfarlane01