NOTICE OF 52-MONTH DELAY AND ORDER REQUIRING STATUS REPORTS

http://a4nr.org/wp-content/uploads/2011/06/NOTICE-OF-52-MONTH-DELAY-AND-ORDER-REQUIRING-STATUS-REPORTS.pdf

PGE Testimony in CPUC case 02/18/11

PGE testimony filed in advance of the CPUC judge’s hearing on whether the settlement should be adopted and whether AB 1632 seismic studies must be completed first 021811 PGE & DRA CPUC testimony

Transcript of James Becker, CPUC + PG&E GRC 2006

Transcript of James Becker, PG&E, in the GRC, as cross-examined on June 26, 2006 at the CPUC. 062006 CPUC-Jim Becker LR costs cross

A4NR Reply to PG&E Motion to Strike Rebuttal

A4NR replies to PG&E’s Motion to Strike A4NR Rebuttal Testimony 102610 A4NR Reply to strike

Rebuttal of A4NR in PG&E CPUC Relicensing Case

Rebuttal of A4NR in PG&E CPUC Relicensing Case 091710 A4NR CPUC Rebuttal final

NRC Shoreline Fault Study Plan 2009

NRC Shoreline Fault Study Plan 2009 NRC-PGE Shoreline Study Plan 2009-1

9.10.2010 – Ltr to NRC Chairman Jaczko re: Seismic Mtg in San Luis Obispo

Ltr to NRC Chairman Jaczko re seismic mtg in SLO or http://a4nr.org/?attachment_id=1106

8.4.2010 – NRC MEMORANDUM AND ORDER (Granting MFP petition to intervene)

8 4 10 MFP LBP-10-15+re+contentions+(8-4-10)[1] or http://a4nr.org/?attachment_id=1045 “This case arises from an application by Pacific Gas & Electric Company (PG&E) to the Nuclear Regulatory Commission (NRC) for renewal of licenses authorizing operation of its two nuclear power reactors at the Diablo Canyon Nuclear Power Plant (DCNPP) located near San Luis Obispo, California.1 The proposed renewal would […]