A4NR letter to NRC Chair Macfarlane re: PG&E’s missing siesmic analysis
On July 26, the Alliance for Nuclear Responsibility sent a letter to incoming NRC Chairwoman Allison Macfarlane reiterating concerns about the unanswered analysis for the Shoreline fault that the NRC requested from PG&E on August 1, 2011.
READ THE LETTER:
072612 Macfarlane01
READ THE ALLIANCE’S PRESS RELEASE: