PG&E GRC 2017

A4NR files testimony in PG&E General Rate Case for 2017

Read the press release here:

042916 PR GRC filing02

 

 

Read the Testimony of witness John Geesman here:

A1509001 – A4NR – Geesman – Ratemaking

 

Read the Testimony of witness Rochelle Becker here:

A1509001 – A4NR – Becker – Policyr

 

Redacted PG&E study of “load-following” operation for Diablo Canyon Nuclear Plant:

A4NR 7.1 Atch01 Nonconfidential curtailment analysis

 

 

HERE ARE PG&E’s DOCUMENTS IN THE CASE:

 

PDF_GRC-2017-PhI_Test_PGE_20151120-Exh15

 

GRC-2017-PhI_Plea_PGE_20150901_346394

 

GRC-2017- Ex5-ch3

 

GRC 050115 PGE Safety Assesment Testimony

 

PGE stator Upgrade plan

 

PGE 2017 GRC – SED March 25 Workshop – PGE RIBA Presentation

 

GRC2017 Workshop

 

102315 PGE GRC statement

Comments are closed.