PG&E 2020 ERRA and Unit 2 Main Generator Failure

The A4NR Response to PG&E’s ERRA filing regarding the costs of the failed main generator at Unit 2 at Diablo Canyon:

031821 A4NR Response-ERRA

Comments are closed.