OPINION AUTHORIZING PACIFIC GAS AND ELECTRIC COMPANY’S GENERAL RATE CASE REVENUE REQUIREMENT FOR 2007 – 2010 – March 15, 2007

2007-03_15 CPUC GRC decision on License Rewewal

http://a4nr.org/wp-content/uploads/2010/05/2007-03_15-CPUC-GRC-decision-on-License-Rewewal.pdf

Diablo Canyon operates pursuant to two licenses issued by the NRC that expire in 2024
(Unit 1) and 2025 (Unit 2). PG&E’s request for Nuclear O&M expenses included $16.8
million spread over 2007-2009 for a license renewal feasibility study. The purpose of the
study is to analyze Diablo Canyon equipment and operations to determine whether to
apply to the NRC for a 20-year extension of the two Diablo Canyon licenses.