A4NR protest of PG&E Motion to reopen Application 10-01-014 for increased funding for seismic studies
101411 A4NR protest 014 reopen
1967 Diablo Canyon Certificate of Public Convenience and Necessity
This 1967 Certificate of Public Convenience and Necessity (CPCN) was issued to PG&E by the California Public Utilities Commission as the permit necessary for them to build and operate (and charge customers for) an electric power generating facility in the state of California. This section, taken from the lengthy application document, deals with the issues […]
A4NR Testimony to Blue Ribbon Commission on Radioactive Waste 9-13-2011
http://a4nr.org/wp-content/uploads/2011/09/A4NR-Testimony-to-BRC-9.13.11.pdf As the Blue Ribbon Commission comes to the end of its second full year of investigation into the issues surrounding disposal and final disposition of high-level radioactive waste, the Alliance for Nuclear Responsibility again encourages the panel to actively consider holding one of their next meetings in the state of California. While we support […]
Transcript of California Energy Commission Nuclear Workshop, July 26, 2011
Here is the transcript of the July 26, 2011 California Energy Commission IEPR workshop on nuclear power, held in Sacramento: 072611 CEC IEPR Transcript
1985 CPUC DRA Disallowance report
This 1985 report by the Division of Ratepayer Advocates (DRA) at the CPUC details the history and costs of the seismic miscalculations and overruns at Diablo Canyon. 081285 DRA-CPUC PGE disallow-full
Fukushima-type disaster inevitable in U.S.?
The Nuclear Regulatory Commission was to meet Tuesday to discuss sweeping new safety recommendations, after having just finished inspecting all 104 U.S. nuclear plants in the wake of Japan’s Fukushima disaster. . . For the rest of the article: http://www.cbsnews.com/stories/2011/07/19/earlyshow/main20080633.shtml
1976 NRC memo on USGS seismic reviews
010576 NRC seismic USGS review
Review of NRC report on Fukushima by IEER – July 19, 2011
Prelimary review of Recommendations for Enhancing Reactor Safety in the 21st Center: The Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, U.S. Nuclear Regulatory Commission, July 12, 2011 prepared by Arjun Makhijani, Ph.D. http://a4nr.org/wp-content/uploads/2011/07/July-19-IEER-review-NRC-report-on-Fukushima.pdf
California to Resume Diablo Canyon Hearings
http://www.baycitizen.org/pge/story/california-resumes-diablo-canyon/ Utilities commission will considering extending facility’s life; opponents cite seismic concerns By John Upton California officials will mull the Diablo Canyon nuclear power plant’s future in early July, during the first public hearing scheduled since a Japanese nuclear power plant began melting down more than two months ago. To continue operating Diablo Canyon from […]
Testimony of U.S. Representative Lois Capps – Committee on Environment and Public Works – April 12, 2011
4 12 11 Capps EPW[1] or http://a4nr.org/wp-content/uploads/2011/04/4-12-11-Capps-EPW1.pdf