Rochelle Becker to address San Juan Capistrano Democrats
Download this flier for the May 8 speaking engagement of A4NR executive director Rochelle Becker at the San Juan Capistrano Democratic club… 050813 SJC Dem Meeting
A4NR motion to compel in PG&E General Rate Case approved by CPUC Judge
This ruling grants the motion filed on April 8, 2013, by the Alliance for Nuclear Responsibility (A4NR) for an order to compel production of data by Pacific Gas and Electric Company’s (PG&E) relating to certain Diablo Canyon seismic activities. 050113 A4NR-compel granted
Testimony of Rochelle Becker/A4NR in SONGS CPUC case 11-04-006
093011 A4NR-SCE Testimony
A4NR Comments on SONGS SG replacement DEIR, 2005
A4NR Comments on SONGS DEIR 052805
SB 418 Home Page
This page is dedicated to Senate Bill 418 (SB 418), legislation sponsored by the Alliance for Nuclear Responsibility. The bill is authored by Senator Hannah-Beth Jackson (D-Santa Barbara) and the principle co-authors are Senator Marty Block (D-San Diego) and Assembly Member Toni Atkins (D-San Diego). Here you will find and can download our Press Release, […]
032913 A4NR Testimony of Rochelle Becker in SONGS OII at CPUC
The Testimony of Rochelle Becker filed at the CPUC in the case of the SONGS OII: 032913 A4NR-RB Tetimony OII
Alliance representatives ejected from Post-Fukushima seismic workshop!
Only one week after the second anniversary of the tragic nuclear disaster at Fukushima, A4NR attorney John Geesman, consulting seismologist Dr. Douglas Hamilton, and A4NR outreach coordinator David Weisman were asked to leave the Ground Motion Characterization workshop for the nuclear power plants in the western United States. These (ratepayer funded) workshops are an integral […]
Sierra Club Activist Network Grant Proposal Project
The following document is in response to: TWO-PAGE STEP 2 PROPOSALS DUE MARCH 15 The PDF file includes the TWO page response. You may download the file at this link: 031113 A4NR-Sierra Club2
Crystal River Reactor withdraws NRC License Amendment Request
The now-closed Crystal River Reactor in Florida has withdrawn its NRC License Amendment Request for a “power uprate” of the reactor that has since been scuttled because of the massive failure of the 2009 steam generator replacement. 031413 Crystal River w:draws NRC LAR
A4NR Opening Brief for SONGS OII filed February 25, 2013
Opening Brief of the Alliance for Nuclear Responsibility filed with the CPUC in the SONGS OII 022513 A4NR Opening Brief-013
