Rochelle Becker at NRC meeting regarding SONGS steam generator–October 9, 2012 in Dana Point

Rochelle Becker, Executive Director of the Alliance for Nuclear Responsibility, discusses the non-profit group’s history, actions and goals to protect California ratepayer’s interests regarding the state oversight of the economics and reliability of nuclear power. The event is the October 9th meeting of the NRC at Dana Point to discuss the ongoing power outages at […]

Letter from Michael Peevey CPUC to Coastal Commission (CCC)

October 12, 2012: Letter from Michael Peevey, president, CPUC, to Mary Shallenberger, California Coastal Commission, regarding permits for Diablo Canyon seismic studies 101212 Peevey CPUC-CCC studies  

Critique of Research Vessel Marcus Langseth

Two documents commenting on the performance of the R/V Marcus Langseth, selected by PG&E and SCE as the research vessel for offshore 3D seismic surveys. Cascadia Open-Access Seismic Transects, cruise report, July 2012 Langseth Cascadia report July 1012   From the NEW TIMES, San Luis Obispo, CA October 11, 2012: Floating the Marcus Langseth Who […]

NRC responses to Shoreline Fault Analysis

The following documents from the NRC comprise their public output regarding seismic re-evaluation of the Shoreline Fault: FULL REPORT OF THE NRC on seismic re-evaluation of Shoreline Fault: 090112 NRC confirms Shoreline analysis   Cover letter from NRC associated with updated Shoreline analysis: 101212 NRC-PGE Ltr confirms Shoreline   Press release of NRC associated with […]

A4NR files Reply Brief for Track 1 CPUC LTPP

Reply Brief of Alliance for Nuclear Responsibility to Track 1 of LTPP 101212 A4NR-CPUC Track 1 reply brief

PG&E Proposed License Amendment Request for Seismic Design Basis at Diablo Canyon

The following documents relate to PG&E’s License Amendment Request for the seismic design basis at Diablo Canyon, in chronological order:   The 1967 NRC Advisory Committee on Reactor Safeguards (ACRS) pre-construction licensing discussion which established the original seismic design basis for Diablo Canyon, based on four postulated earthquake scenarios: 092067 AEC ACRS-1   PG&E’s Application […]

Alliance Statement on PG&E Seismic Testing

Download press release here: 092012 A4NR on Seismic Testing PR

REPORTS ON CONSEQUENCES OF FUKUSHIMA NUCLEAR DISASTER ON FISHING AND MARINE ENVIRONMENT

Whether it is ongoing contamination of seafood, the devastation of the fishing industry, drastic clean up plans or overall impacts to the marine environment, the consequences of the nuclear disaster at Fukushima continue: From the NEW YORK TIMES, October 25, 2012:  TOKYO — Elevated levels of cesium still detected in fish off the Fukushima coast […]

Alliance letter to CPUC President Peevey re: Inadequate SONGS seismic study oversight

Letter from Alliance to CPUC President Peevey regarding inadequate oversight by the CPUC of the seismic studies as San Onofre Nuclear Generating Station SONGS. 091012 Peevey01

PGE revised study plans to account for concerns of Dr. Hamilton

082312 DCPP near Nodel Deployment   082312 DCPP_Onshore_Su…ide .6 Area