1985 CPUC DRA Disallowance report

This 1985 report by the Division of Ratepayer Advocates (DRA) at the CPUC details the history and costs of the seismic miscalculations and overruns at Diablo Canyon. 081285 DRA-CPUC PGE disallow-full

Fukushima-type disaster inevitable in U.S.?

The Nuclear Regulatory Commission was to meet Tuesday to discuss sweeping new safety recommendations, after having just finished inspecting all 104 U.S. nuclear plants in the wake of Japan’s Fukushima disaster. . .   For the rest of the article: http://www.cbsnews.com/stories/2011/07/19/earlyshow/main20080633.shtml

1976 NRC memo on USGS seismic reviews

010576 NRC seismic USGS review

A4NR Comments on Data Requests submitted to CEC for 2011 IEPR

The following documents are the comments of the Alliance for Nuclear Responsibility (A4NR) to the California Energy Commission (CEC) that outline the omissions, contradictions or inadequacies of the responses to Data Requests that the CEC sent to both nuclear utilities, PG&E and Southern California Edison (SCE) These comments provide the background for the summary and […]

NGO Letter to NRC concerning report by the “Near-Term Task Force”

http://a4nr.org/wp-content/uploads/2011/07/7.19.11-NGO-Group-Letter-to-NRC.pdf

Review of NRC report on Fukushima by IEER – July 19, 2011

Prelimary review of Recommendations for Enhancing Reactor Safety in the 21st Center: The Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, U.S. Nuclear Regulatory Commission, July 12, 2011 prepared by Arjun Makhijani, Ph.D. http://a4nr.org/wp-content/uploads/2011/07/July-19-IEER-review-NRC-report-on-Fukushima.pdf

California Energy Commission workshop on nuclear power-July 26, 2011 in Sacramento

The California Energy Commission is holding their workshop on nuclear power July 26, 2011 in Sacramento.  Download and read the agenda.  The public can participate with questions and recommendations in person, or via web and phone connections. The instructions are within the attached agenda document.  This is your chance to have your issues raised and […]

NRC 90-day review of “Lessons Learned from Fukushima”

071311 NRC 90 Day Fukushima Report

PG&E response to A4NR Motion to Dismiss

063011 PGE res…4NR Dismiss

US ENVIRONMENTAL PROTECTION AGENCY REVISIONS TO THE PROTECTIVE ACTION GUIDANCE MANUAL 6.9.2011

http://a4nr.org/wp-content/uploads/2011/06/6-9-11-NRC-vs-EPA-on-protective-action.pdf “PURPOSE: The purpose of this paper is to inform the Commission of the status of the ongoing revisions to the U.S. Environmental Protection Agency (EPA) Protective Action Guidance (PAG) Manual.”

« Previous PageNext Page »