A4NR Testimony to Blue Ribbon Commission on Radioactive Waste 9-13-2011
http://a4nr.org/wp-content/uploads/2011/09/A4NR-Testimony-to-BRC-9.13.11.pdf As the Blue Ribbon Commission comes to the end of its second full year of investigation into the issues surrounding disposal and final disposition of high-level radioactive waste, the Alliance for Nuclear Responsibility again encourages the panel to actively consider holding one of their next meetings in the state of California. While we support […]
NRC Population near reactors, from 2000 U.S. Census figures
HERE ARE THE POPULATIONS LIVING WITHIN 20 and 50 MILES OF NUCLEAR REACTORS, FROM THE 2000 U.S. Census NRC population near reactors 2000
Transcript of California Energy Commission Nuclear Workshop, July 26, 2011
Here is the transcript of the July 26, 2011 California Energy Commission IEPR workshop on nuclear power, held in Sacramento: 072611 CEC IEPR Transcript
Transcripts of NRC Seismic Workshop in San Luis Obispo, September 9-8, 2010
Transcript of September 8, 2010, morning session 090810 NRC seismic SLO-AM Transcript of September 8, 2010, afternoon session 090810 NRC seismic SLO-PM Transcript of September 9, 2010, morning session 090910 NRC seismic SLO-AM Transcript of September 9, 2010, afternoon session 090910 NRC seismic SLO-PM
1985 CPUC DRA Disallowance report
This 1985 report by the Division of Ratepayer Advocates (DRA) at the CPUC details the history and costs of the seismic miscalculations and overruns at Diablo Canyon. 081285 DRA-CPUC PGE disallow-full
Fukushima-type disaster inevitable in U.S.?
The Nuclear Regulatory Commission was to meet Tuesday to discuss sweeping new safety recommendations, after having just finished inspecting all 104 U.S. nuclear plants in the wake of Japan’s Fukushima disaster. . . For the rest of the article: http://www.cbsnews.com/stories/2011/07/19/earlyshow/main20080633.shtml
1976 NRC memo on USGS seismic reviews
010576 NRC seismic USGS review
AB 1632 Study and Workshop Overview – Barbara Byron – July 26, 2011
http://a4nr.org/wp-content/uploads/2011/07/7-26-11-CEC-presentation1.pdf
A4NR Comments on Data Requests submitted to CEC for 2011 IEPR
The following documents are the comments of the Alliance for Nuclear Responsibility (A4NR) to the California Energy Commission (CEC) that outline the omissions, contradictions or inadequacies of the responses to Data Requests that the CEC sent to both nuclear utilities, PG&E and Southern California Edison (SCE) These comments provide the background for the summary and […]
Recommendations of A4NR to the California Energy Commission for the 2011 IEPR Nuclear Power Workshop
Here are the formal comments of the Alliance for Nuclear Responsibility to the California Energy Commission for the 2011 IEPR nuclear workshop. The Alliance finds multiple contradictions, inadequacies and omissions in the claims made by PG&E and Edison, and provides our own roadmap for the CEC to consider when planning a safe, reliable and affordable […]
